The existing products are continuously improved to achieve platformization of internal structures;
CAE analysis capabilities will be improved in 2024.
The third fully automated production line will be in place in November 2023; the fourth fully automated production line will be in place in March 2024; the fifth fully automated production line...
In 2024, a comprehensive test equipment independently designed and developed is in place, with 12 performance tests for tooling and shock absorber assembly.
The automated production line has achieved a total of
13 control points, all covering 100% inspection.
Copyright © 2024 - 2025 Suzhou Anduocheng Automotive Parts Co., Ltd. All Rights Reserved. ICP:苏ICP备12040745号-1 后台管理 技术支持:TONSUNG